Percent: Difference between revisions
Appearance
m 2 revisions imported |
This flag has nothing to do with credit carryover. |
||
| Line 3: | Line 3: | ||
|files={{Categ|Maps}} | |files={{Categ|Maps}} | ||
|types={{Categ|Basic}} | |types={{Categ|Basic}} | ||
|values={{Values| | |values={{Values|int|0–100}} | ||
|default=no | |default=no | ||
|ra=yes | |ra=yes | ||
| Line 14: | Line 14: | ||
|ra2=yes | |ra2=yes | ||
|yr=yes | |yr=yes | ||
|tsobsolete=yes | |||
}} | }} | ||
Specifies the the percent that the computer-controlled base is to be built up to at single-player [[scenario]] start. | |||
==See Also== | |||
* [[PercentBuilt]] | |||
Latest revision as of 15:39, 8 May 2025
|
|
|
|
|
|
| Flag: | Percent |
| File(s): | Maps |
| Values: | Signed integers: All whole numbers from -2147483648 to 2147483647; in rare cases, only from -32768 to 32767. (Limited to: 0–100) |
| Default: | no |
| Applicable to: | Basic |
| |
Specifies the the percent that the computer-controlled base is to be built up to at single-player scenario start.





