Jump to content

RepairPercent: Difference between revisions

From ModEnc²
en>DCoder
No edit summary
 
m 4 revisions imported
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{DeeZireInclusion}}<br />
{{Flag
Percentage of the units' Cost= that it will cost the player (in credits) to fully repair this unit from badly damaged (i.e. health bar is red) when it is docked with a UnitRepair=yes structure. No unit gets repaired for free (unless of course you use a repair vehicle or mechanic).
|values={{Values|percent}}
|default=25%
|types={{Categ|General}}
|ts=yes
|fs=yes
|ets=yes
|ra2=yes
|yr=yes
}}
 
This flag controls how much it costs to repair [[VehicleTypes]] docked with a [[BuildingType]] with {{f|UnitRepair|yes|link}} set, and BuildingTypes that are being repaired using a gameplay function (the "wrench" tool).
 
The cost to recover {{f|RepairStep|link}} hitpoints every {{f|RepairRate|link}} minutes can be calculated by the following formula{{fnl|1}}:
 
<pre>"repair step cost" = RepairPercent * ( Cost / ( Strength / RepairStep) )</pre>
 
If the result is a [[Help:Values#Floating_Point_Values|floating point value]], all decimal places are ignored. Also, if the result is less than 1, it is bumped up to 1.
 
 
==Notes==
{{fn|1|The division done in this formula is integer division, which means that any decimal places will be knocked off; i.e. 5/2 {{equal}} 2, not 2.5.}}
 
==References==
* {{SourceCode|http://dc.strategy-x.com/src2/TechnoTypeClass/GetRepairStepCost.cpp}}

Latest revision as of 22:03, 31 March 2025

Tiberian Dawn Red Alert Tiberian Sun Firestorm Red Alert 2 Yuri's Revenge
Flag: RepairPercent
File(s): rules(md).ini
Values: Percentages: Either a direct percentage (e.g. "50%"), or a floating point value (e.g. "0.5").
Default: 25%
Applicable to: General


This flag controls how much it costs to repair VehicleTypes docked with a BuildingType with UnitRepair=yes set, and BuildingTypes that are being repaired using a gameplay function (the "wrench" tool).

The cost to recover RepairStep hitpoints every RepairRate minutes can be calculated by the following formula1:

"repair step cost" = RepairPercent * ( Cost / ( Strength / RepairStep) )

If the result is a floating point value, all decimal places are ignored. Also, if the result is less than 1, it is bumped up to 1.


Notes

1 The division done in this formula is integer division, which means that any decimal places will be knocked off; i.e. 5/2 = 2, not 2.5.

References